Sponsor


Final Lockheed Martin-built modernized GPS IIR spacecraft launched for U.S. Air Force

August 18, 2009

CAPE CANAVERAL AIR FORCE STATION, Fla., 18 Aug. 2009. A modernized Global Positioning System Block IIR (GPS IIR-M) satellite, designed and built by Lockheed Martin for the U.S. Air Force, launched from Cape Canaveral Air Force Station aboard a United Launch Alliance (ULA) Delta II rocket.

Designated GPS IIR-21(M), the satellite is the last of eight GPS IIR-M spacecraft that the Lockheed Martin Navigation Systems team in Newtown, Pa., modernized for its customer, the Global Positioning Systems Wing, Space and Missile Systems Center, Los Angeles Air Force Base, Calif.

The Block IIR-M series enhances operations and navigation signal performance for military and civilian GPS users around the globe -- specifically a modernized antenna panel that provides increased signal power to receivers on the ground, two new military signals for improved accuracy, enhanced encryption and anti-jamming capabilities, and a second civil signal, providing users with an open access signal on a different frequency, says a representative.

Lockheed Martin is developing the next-generation GPS III spacecraft to improve position, navigation, and timing services for users worldwide. The first block of the new generation satellites, known as GPS IIIA, will deliver significant enhancements over current GPS space vehicles, including a new international civil signal (L1C), and increased M-Code anti-jam power with full earth coverage for military users.

The satellite will join six IIR-M satellites and 12 other operational Block IIR satellites within the current 30-spacecraft constellation. Air Force Space Command's 2nd Space Operations Squadron (2SOPS), based at Schriever Air Force Base, Colo., manages and operates the GPS constellation for civil and military users.

Lockheed Martin Space Systems, Newtown, Pa., is the prime contractor for the GPS IIR program. The company designed and built 21 IIR spacecraft. ITT, Clifton, N.J., supplied all 21 navigation payloads for both the IIR and IIR-M spacecraft.

The Lockheed Martin-led GPS III team is progressing on schedule, with first launch of a GPS IIIA satellite on track for 2014. The program team completed the Preliminary Design Review (PDR) phase and is now in the midst of the Critical Design Review (CDR) phase.

Social Media Tools

Sponsored by:
Recommend this Article Recommend this Article () You Recommended this Article You Recommended this Article ()

REPRINTS: Is your company featured in this article? Click here to purchase reprints.


Most Popular Articles

Webcasts

On Demand

DO-178C: The Evolution of Software Technology in Safety

This webinar will examine the impact these supplements will have on certifiable aircraft software development, the developers and the processes which are used.

Sponsored by:

Small Form Factor

Join Military & Aerospace Electronics for an insightful Webcast on small form factor systems and components, including the benefits that SFF innovations hold for current and future mil-aero applications....

VPX for Unmanned Systems

Join us for this webcast as we hear from VITA and industry experts on the latest developments in VPX technology.

Mil & Aero Magazine

February 2012
Volume 23, Issue 2

M&AE Article Archives

Close this offer Close
Military & Aerospace Electronics Defense Executive Ebedded Computing Report Avionics Intelligence
Subscribe
FREE Newsletters from the Aerospace & Defense Media Group
Required field
Required field
Required field
I would like to receive the following e-mail newsletters
Military & Aerospace Electronics Weekly Yes No Required field
Defense Executive Yes No Required field
Embedded Computing Report Yes No Required field
Avionics Intelligence Yes No Required field
In order to subscribe, you must select at least one newsletter above.
No Thanks. No Thanks