Sponsor


VPX embedded computer not to blame for $14 million cost overrun in Marine Corps G/ATOR radar system

November 19, 2009

Posted by John Keller

LINTHICUM HEIGHTS, Md., 19 Nov. 2009. The U.S. Marine Corps mobile air-defense surveillance radar system called the Ground/Air Task-Oriented Radar (G/ATOR) has had a $14 million cost overrun, but these unanticipated added costs have had nothing to do with VPX embedded computing, for which G/ATOR is an early adopter (see orginal story), say officials of G/ATOR radar system developer Northrop Grumman Corp.

Engineers at the Northrop Grumman Electronic Systems segment in Linthicum, Md., are designing G/ATOR radar technology with VITA 46 VPX embedded computer technology with high-speed serial interconnects from Curtiss-Wright Controls Embedded Computing in Leesburg, Va. Curtiss-Wright is providing VPX-based radar signal processing subsystems under terms of a $4.3 million contract awarded from Northrop Grumman in March, 2008.

The G/ATOR ground radar cost overruns, reported last October in Pentagon contracting documents, were due primarily to additional capability added during the past four years, and to unexpected developments like the rising cost of gold, which makes advanced electronic connectors for the military radar more expensive, explains Mark Smith, business development director for tactical radars at Northrop Grumman.

The overruns "really didn't have anything to do with the VPX computing," Smith told Military & Aerospace Electronics in an exclusive interview today. "We have a close relationship with our processor suppliers, and we chose the Curtiss-Wright processor for its capability and growth."

The primary cause of the cost overrun to the G/ATOR system is "additional scope of effort," Smith explains, not because of anything to do with the VPX computing supplied by Curtiss-Wright.

The mobile G/ATOR will provide enhanced capabilities to detect, track, and provide target-quality data to enable Marine Corps expeditionary forces to detect and destroy enemy aircraft, cruise missiles, and unmanned aerial vehicles (UAVs).

G/ATOR is an expeditionary Humvee-based gap-filler radar that provides 3-D of areas out of view of the AN/TPS-59 (V) 3 radar system, and is intended to replace the AN/ TPS-63 and AN/MPQ-62 radars.

The primary mission of the G/ATOR is to locate mortar, artillery, and rocket threats and provide location information to counter-fire weapons.

For more information contact Northrop Grumman Electronic Systems online at www.es.northropgrumman.com, or Curtiss-Wright Controls Embedded Computing at www.cwcembedded.com.

Subscribe

Follow me on Twitter

Join the PennWell Aerospace and Defense Media Group on Linkedin at http://bit.ly/9MXl9

Become a fan of Military & Aerospace Electronics on Facebook at http://bit.ly/1VGM0Q

Post your aerospace and defense-related material to the #milaero community on Twitter. Use the #milaero hashtag.

Social Media Tools

Sponsored by:
Recommend this Article Recommend this Article () You Recommended this Article You Recommended this Article ()

REPRINTS: Is your company featured in this article? Click here to purchase reprints.


Most Popular Articles

Webcasts

On Demand

DO-178C: The Evolution of Software Technology in Safety

This webinar will examine the impact these supplements will have on certifiable aircraft software development, the developers and the processes which are used.

Sponsored by:

Small Form Factor

Join Military & Aerospace Electronics for an insightful Webcast on small form factor systems and components, including the benefits that SFF innovations hold for current and future mil-aero applications....

VPX for Unmanned Systems

Join us for this webcast as we hear from VITA and industry experts on the latest developments in VPX technology.

Mil & Aero Magazine

February 2012
Volume 23, Issue 2

M&AE Article Archives

Close this offer Close
Military & Aerospace Electronics Defense Executive Ebedded Computing Report Avionics Intelligence
Subscribe
FREE Newsletters from the Aerospace & Defense Media Group
Required field
Required field
Required field
I would like to receive the following e-mail newsletters
Military & Aerospace Electronics Weekly Yes No Required field
Defense Executive Yes No Required field
Embedded Computing Report Yes No Required field
Avionics Intelligence Yes No Required field
In order to subscribe, you must select at least one newsletter above.
No Thanks. No Thanks